DPP Timeline 2026–2030: Deadlines by Sector

DPP Timeline 2026–2030: Deadlines by Sector

Last updated: November 2026.

The Digital Product Passport (DPP) does not arrive for everyone at once. The Ecodesign for Sustainable Products Regulation (EU) 2024/1781 (ESPR) switches it on sector by sector, through delegated acts, and each one allows at least 18 months from entry into force before the obligation applies. So the useful question is not "when does the DPP start?" but "when does it start for what I make, import or sell?".

This page answers that. Start with the table and, if your sector is there, read the section that applies to you.

The timeline at a glance

Sector or requirement Legal basis Status (Nov 2026) DPP mandatory
EU passport registry ESPR Art. 13 and Implementing Regulation (EU) 2026/1778 Live since 20 July 2026 Infrastructure (not a product obligation)
Ban on destroying unsold clothing and footwear ESPR Art. 25 and Delegated Regulation (EU) 2026/296 Applies to large companies since 19 July 2026 Not a DPP; medium-sized companies from 19 July 2030
Batteries for electric vehicles, light means of transport and industrial batteries above 2 kWh Regulation (EU) 2023/1542, Art. 77 Date fixed in the regulation 18 February 2027
Iron and steel ESPR delegated act Adoption targeted for Q4 2026; not adopted as of mid-October Around 2028 (estimated)
Textiles and apparel ESPR delegated act Adoption targeted for Q4 2027 Around 2029 (estimated)
Tyres and aluminium ESPR delegated acts Adoption planned for 2027 Around 2029 (estimated)
Repairability (horizontal; scope under study: consumer electronics and small household appliances) ESPR Adoption planned for 2027 Around 2029 (estimated)
Furniture ESPR delegated act Adoption planned for 2028 Around 2030 (estimated)
Mattresses ESPR delegated act Adoption planned for 2029 Around 2031 (estimated)
Recyclability and recycled content of electrical and electronic equipment (horizontal) ESPR Adoption planned for 2029 Around 2031 (estimated)
Construction products Regulation (EU) 2024/3110 The delegated act setting up the passport system has no date yet 18 months after that act

Adoption dates are the indicative ones in the first Ecodesign Working Plan 2025–2030 and the Commission's sector pages. "Estimated" dates add the minimum 18-month period to that adoption. Each delegated act will set the exact date, and in practice they tend to slip.

What is already in place

The working plan. On 16 April 2025 the Commission published its first Ecodesign and Energy Labelling Working Plan 2025–2030 (COM(2025) 187). It sets the order: four final products (textiles and apparel, furniture, tyres, mattresses), two intermediate products (iron and steel, aluminium), two horizontal requirements (repairability, and recyclability and recycled content of electrical and electronic equipment) and 16 energy-related product groups carried over from the previous plan.

The EU registry. ESPR required the Commission to have the passport registry ready by 19 July 2026, and it went live on 20 July. Its rules are in Implementing Regulation (EU) 2026/1778. The registry does not hold passport data: it stores each product's unique identifier and points to the passport, which is hosted by the economic operator or its provider.

The technical standards. In July 2026 the references of the first harmonised European DPP standards (the EN 18200 series) were published. They set how products are identified and how data is accessed and exchanged. A passport built to them is presumed to conform with ESPR.

Unsold clothing and footwear. Since 19 July 2026 large companies may not destroy unsold apparel, clothing accessories or footwear, except under the derogations in Delegated Regulation (EU) 2026/296. It is not a passport, but it already requires control and traceability of stock.

Sector by sector

Batteries: the first fixed date, 18 February 2027

This is the first passport required by law, and it comes from the Batteries Regulation (EU) 2023/1542, not from ESPR. From 18 February 2027, every electric vehicle battery, every light means of transport battery (e-bikes and e-scooters, for example) and every industrial battery above 2 kWh will need a passport to be sold or put into service in the EU. Its unique identifier will have to be uploaded to the EU registry. If you make, import or assemble these batteries, your deadline is now measured in months, not years.

Iron and steel: the first ESPR act

This is the first group in the plan. The public consultation closed on 12 August 2026 and the Commission is aiming to adopt the act in Q4 2026. If it does, the passport would apply around 2028. It also matters to steel buyers: carbon footprint and recycled-content data will flow downstream to the manufacturers who use it.

Textiles and apparel: 2027 for the rules, around 2029 for the passport

The textiles delegated act is expected in Q4 2027, with the passport applying around 2029. It will set requirements for durability, repairability, recycled content and substances, and the exact fields of the textile DPP. Footwear depends on a study due by the end of 2027.

Tyres and aluminium: 2027

Both are planned for adoption in 2027. For tyres the focus is recyclability, recycled content and end-of-life impact. For aluminium, as with steel, it is footprint and material origin.

Electronics: horizontal requirements instead of its own act

Electronics does not get its own delegated act in this plan. Two cross-cutting requirements apply instead: repairability, with a scoring system, planned for 2027, and recyclability and recycled content of electrical and electronic equipment, planned for 2029. Mobile phones and tablets also follow their own track as energy-related products.

Furniture and mattresses: the end of the decade

Furniture is planned for adoption in 2028 and mattresses in 2029, so their passports would arrive around 2030 and 2031.

Construction products: their own regulation

Construction products do not go through ESPR but through the new Construction Products Regulation (EU) 2024/3110, applicable since 8 January 2026. Its passport system will be created by a delegated act that has no date yet; from its entry into force, manufacturers will have 18 months to provide the passport.

Energy-related products

Ecodesign regulations adopted under the old Directive 2009/125/EC (fridges, washing machines, light sources and so on) remain in force until ESPR replaces them. For 19 product groups whose review was under way, the Commission may keep using the old directive until 31 December 2026. After that, reviews are done under ESPR, and that is where the passport can be added.

What to do, depending on your company

  • EU manufacturer: find your sector in the table and count backwards. Gathering supplier data (composition, origin, footprint) is what takes longest, and it does not depend on the act being published.
  • Non-EU manufacturer: you will need someone in the EU who answers for the product, such as an importer or an authorised representative, and passport data flowing from the factory.
  • Importer or distributor: you will check that what you sell has a passport and that its identifier is in the registry. Ask your suppliers now how they plan to comply.
  • Online shop: the passport will have to be accessible to the buyer. Get your product pages ready to link to it.

Why you shouldn't wait

Even if your sector sits near the end of the table, 18 months is not much time to organise the data of a whole supply chain. Companies that start early choose a provider calmly, test with a few products and reach the deadline with the system already running.

At ESCO TOKEN we create and host ESPR-compliant passports, including registration of the identifier in the EU system. If you want to know what data your sector will require, get in touch. To understand exactly what the passport is and what it contains, read our guide to the Digital Product Passport.

Frequently asked questions

When is the Digital Product Passport mandatory?
There is no single date. The first fixed one is 18 February 2027, for electric vehicle, light means of transport and industrial batteries above 2 kWh. For other sectors, the obligation arrives 18 months or more after their delegated act is adopted.

Which sector is first to get a passport under ESPR?
Iron and steel, with the act expected at the end of 2026 and the passport around 2028. Textiles, tyres and aluminium follow, with acts planned for 2027.

When does the DPP apply to textiles?
The textiles and apparel delegated act is expected in Q4 2027, and the passport would apply around 2029.

What is the EU passport registry?
A central index run by the Commission, live since 20 July 2026, that stores each product's unique identifier and points to its passport. It does not store passport data.

Can the dates in this table change?
Yes. Apart from batteries, whose date is set by the regulation itself, they are indicative dates from the working plan. We update this page whenever an act is adopted.

Official sources